Broward County, Florida
Balcony Restoration in Broward County
Slab edges rebuilt, surfaces waterproofed, railings replaced and anchored correctly.
In short
Who handles balcony restoration in Broward?
Unified GCS carries out balcony restoration in Broward County for condominium associations and hotels. A balcony project involves removing tile and coatings, repairing the slab edge, soffit and railing post pockets, correcting the slope, installing a waterproof membrane and fitting railings that meet current code. The work follows a licensed engineer's drawings and is permitted through the city building department.
Balconies & Railings · Broward
Balcony restoration in Broward County typically combines four scopes on one permit: concrete repair at the slab edge and soffit, repair of the railing post pockets, a waterproof membrane or deck coating, and new or re-anchored railings. Unified GCS carries out all four, so the slab is not repaired by one contractor and left for another to drill into. The work follows the engineer's repair drawings and is inspected at each stage.
A balcony is a thin cantilevered slab with steel close to the surface and water sitting on top of it. When the surface is tiled, damage stays hidden until the edge cracks or the ceiling of the balcony below starts to stain. We remove finishes where the engineer requires, repair the concrete, correct the slope so water drains away from the sliding door and finish with a system suited to the exposure.
Written and reviewed by the Unified GCS project team, 45 years in concrete restoration and construction. Last reviewed October 2026.


Local conditions
What oceanfront exposure does to balconies in Broward County
The towers along the Galt Ocean Mile, Pompano Beach and the Hollywood and Hallandale Beach oceanfront were largely built with flat balcony slabs and aluminum or steel railing posts set directly into pockets in the concrete. Water collects in those pockets, the post base corrodes and the concrete around it cracks. On many of these buildings, unit owners later added tile over the slab with no membrane beneath it, which traps salt water against the concrete.
Balconies and guardrails are specifically within the scope of the county's Building Safety Inspection Program, so they are examined when a building reaches 25 years and every 10 years after. A typical report calls for edge and soffit repairs, post pocket rebuilds and a railing system that meets current height and loading requirements. Buildings facing the Intracoastal see the same damage on a slower timeline.
Where this work is needed
Where balcony and catwalk repairs are found in Broward
Cantilevered balconies on the ocean side of A1A take the hardest exposure in Broward. On the towers of Fort Lauderdale beach, Pompano Beach, Hollywood beach and Hallandale Beach, the typical findings are cracked slab edges, rust staining at railing posts, tile laid without a membrane and ceilings that stain from the balcony above. West-facing balconies on the same buildings look out over the Intracoastal Waterway and usually deteriorate more slowly, so a repair program often treats the two elevations with different quantities.
Balcony work in inland Broward looks different. Three- and four-story condominium communities in Tamarac, Lauderhill, Sunrise, Margate, Coconut Creek and Pembroke Pines have small recessed balconies and long open catwalks that serve as the only route to each front door. The usual problems are ponding water, cracked walkway edges, corroded railing posts and screened enclosures fastened into the slab. Because a catwalk cannot be closed the way a private balcony can, repairs are done in short sections with temporary protected access past the work.
What is included
Balcony restoration in Broward County: scope of work
- 01Balcony and catwalk slab edge and soffit repair
- 02Slope correction and drainage
- 03Waterproof membranes and decorative deck coatings
- 04Aluminum, glass and picket railing fabrication and installation
- 05Post pocket repair and railing anchor replacement
- 06Sliding door threshold and stucco tie-in repair

Our approach
Sequencing balcony work on an occupied Broward tower
We work by stack. A swing stage or mast climber serves one vertical line of balconies at a time, the sliding doors on that line are secured from the inside, and residents get written notice of the closure and reopening dates. Chipping, steel repair and pours move down the stack, followed by waterproofing and railings, so each line is returned as a finished balcony.
Railings are measured and fabricated while concrete work is under way so installation follows without a gap. New posts are anchored into sound, repaired concrete using the detail the engineer specifies, and sealed so the pocket cannot hold water again. Overhead protection stays in place at entrances, pool decks and parking areas below the drop for as long as work continues above.
Unified GCS has 45 years in the business. See the full balconies & railings service or everything we do in Broward County.
Planning the project
What a Broward board decides before balcony work starts
A Broward balcony project needs several board decisions before the permit is filed. The board chooses the finish that will be allowed after the repair, usually a single deck coating or tile over an approved membrane, and settles who is responsible for removing owner-installed tile, shutters and screen enclosures. The railing design has to be selected early, because shop drawings, engineering and fabrication take longer than most of the concrete work. The city building department reviews the railing with the repair permit.
Resident notice matters more on balcony work than on most repairs, because each household loses its outdoor space and has its sliding door secured for a period. A stack-by-stack calendar, issued before mobilization and updated as quantities are confirmed, lets seasonal owners in Broward arrange for furniture to be moved while they are away. Membranes and coatings need dry concrete, so the waterproofing stage is scheduled around the afternoon storms of the rainy season, and swing stages are secured whenever a tropical system approaches.
How a project runs
From the first site walk to the closed permit.
- 01
Walk the property
We start on site with your manager, board or engineer and look at the conditions first-hand.
- 02
Define the scope
You get a written scope tied to the engineer's report or our findings, with the phasing spelled out.
- 03
Plan access and safety
Swing stages, shoring, barricades, parking and resident notices are set before the first cut.
- 04
Do the work
Our crews carry out the repairs in sequence, with inspections at the points the engineer requires.
- 05
Close it out
Final inspections, permit closure and a record of what was done, for the association's files.
Cities served
Balconies & Railings across Broward County
Summary
Key takeaways for Broward owners and boards
- 01
Ocean-facing balconies on A1A towers in Broward usually need more concrete repair than the Intracoastal side of the same building.
- 02
Inland Broward communities with open catwalks need repairs phased in short sections so residents can still reach their front doors.
- 03
Railing selection and fabrication should start early, because railings often set the finish date of a Broward balcony project.
- 04
A Broward board should adopt one approved balcony finish before work starts so every stack is rebuilt to the same detail.
Questions
Balconies & Railings in Broward: common questions
Does balcony tile have to be removed during a Fort Lauderdale restoration project?
Often, yes. The engineer cannot evaluate the slab through tile, and concrete repairs and membranes cannot be installed over it. When the report calls for removal, the association decides what finish is allowed afterward. Many boards adopt a single approved deck coating or a tile system installed over a proper membrane.
How long is a balcony closed during restoration in Broward County?
It depends on how much concrete damage is found once the surface is opened and on the railing lead time. We give each stack a start and finish window before work begins and update it as quantities are confirmed. Balconies stay closed only while their own line is under repair.
Can existing railings be reused on a Pompano Beach condominium?
Sometimes. If the posts are sound and the system meets current code for height, spacing and load, it can be re-anchored and refinished. Where embedded posts have corroded inside the slab or the railing no longer complies, the engineer will normally call for replacement with a surface-mounted or core-set system.
Who removes hurricane shutters and screen enclosures before balcony repairs in Hallandale Beach?
The condominium documents and the board decide. Shutters, screens and enclosures attached to the slab or balcony ceiling normally have to come off so the concrete can be inspected and repaired. Many associations have the contractor remove them under the project and set one rule for what may be reinstalled, so new anchors do not damage the repaired slab.
Are catwalks on inland Broward County condominiums repaired the same way as balconies?
The repair method is the same: remove damaged concrete, treat or replace the steel, rebuild the edge and waterproof the surface. The difference is access. On balcony restoration in Broward County a private balcony is simply closed, while a catwalk is the route to the units, so it is repaired in short sections with a protected path kept open.
Can balcony repairs in Fort Lauderdale continue during hurricane season?
Yes. Most multi-stack projects run through summer because they take many months. The contractor needs a written storm plan: stages lowered and tied off, loose material removed from balconies and the roof, and open repair areas made safe before a storm arrives. Expect some lost days around each storm threat and around heavy afternoon rain.
Regulations referenced
- Broward County Board of Rules and Appeals Policy 05-05: Building Safety Inspection Program
- Florida Statute 553.899: mandatory structural inspections for condominium and cooperative buildings
- Florida Statute 718.112: structural integrity reserve studies
This page is general information, not legal or engineering advice. Inspections are performed by licensed engineers and architects, and your building official sets the dates that apply to your property. Unified GCS is the contractor that carries out the repairs.
Referred by an engineer?
Have drawings, specifications or a full set of bid documents?
Most of our restoration, pool and roofing work comes to us through structural engineers, property engineers and board members. When the scope is already drawn and specified, we price exactly what is on the documents, flag anything that needs a question, and show every line so the board can compare bids fairly.
Request an estimate
Let's look at your building.
Send us the engineer's report, a few photos or a short description. We will schedule a site visit and follow up with a written scope.
- 45 years in the business
- Broward and Palm Beach counties
- Reply within one business day
Prefer to talk?(561) 678-4182
We reply within one business day. Your details are only used to respond to this request.