How an association moves from an engineer's report to a signed restoration contract, with the engineer, manager and contractor each in the right role.

In short

How does a condominium board get from an engineer's report to a restoration contract?

Condo boards usually hire a licensed engineer to turn the milestone or structural report into repair drawings and specifications, then invite several contractors to bid on those same documents. The board compares proposals line by line, checks license, insurance, permits and schedule, and signs a contract its engineer and attorney have reviewed. Funding comes from reserves, special assessments or a loan, decided by the board.

Where it starts

How condo boards move from a report to a contract

Most restoration projects reach condo boards as a document: a milestone inspection report, a structural integrity reserve study, a Building Safety Inspection report under Broward's program, or an engineer's letter after a leak or a spall. That report says what is wrong and how urgent it is, but it is rarely a set of construction documents. The steps between the report and a signed contract decide whether the project is bid fairly, priced accurately and built without surprises, so they deserve as much care as the repair.

Florida Statute 553.899 requires the engineer or architect who performs a milestone inspection to give the association a sealed report with a summary of the material findings and recommendations. The association must distribute that summary to unit owners within 45 days of receiving it. Where a phase two report identifies substantial structural deterioration, local governments set a timeframe for repairs, and the statute requires those repairs to be commenced within 365 days after the report is received. Your building official and attorney confirm the dates that apply.

Step one

Hire an engineer to design the repair

The first hire is an engineer, not a contractor. A licensed structural or restoration engineer surveys the building in more detail, sounds the slabs, marks the repair locations and prepares signed and sealed drawings and specifications. Those documents define the scope precisely enough that several contractors can price identical work. The engineer usually also writes the bid form, answers questions during bidding, reviews submittals, inspects the work in progress and reviews payment requests, which gives the board an independent professional on its side of the table.

Condo boards sometimes ask a contractor to propose a repair without drawings. On a small, well-defined maintenance job that can be reasonable. On structural work it leaves the board comparing proposals that describe different scopes in different words, with nobody independent to judge quantities or workmanship. We will walk a building and give an honest view of what we see, but for structural repairs we recommend that the engineer's documents come first, and we then price those documents exactly as written.

Condo boards and a community association manager walking a balcony repair with our crew

Step two

Competitive bids on the same bid package

Once the drawings, specifications and bid form are ready, the engineer or manager invites contractors to price the same set, usually after a pre-bid site walk. Every bidder sees the same building, gets the same answers through written addenda, and prices the same lines. Florida Statute 718.3026 requires condominium associations to obtain competitive bids for contracts above a share of the annual budget, and it states that the association is not required to accept the lowest bid. Homeowners' associations follow a different chapter of Florida law.

Comparing proposals is easier when they share a format. Line up the unit prices for each repair type, not only the totals, because quantities on restoration work almost always change once concrete is opened. Check what each bidder clarified or excluded, how long they need, how many crews and swing stages they plan to run, and who their superintendent will be. A low total built on low unit prices for small estimated quantities, and high ones for the items that tend to grow, can end up costing the association the most.

Due diligence

License, insurance, permit and schedule questions

Before signing, ask every finalist for its state contractor license number and verify it with the Florida Department of Business and Professional Regulation, then ask for certificates of insurance showing general liability and workers' compensation coverage, with the association named as the engineer and attorney require. Ask who pulls the permit, who schedules inspections, and how the contractor protects residents, cars and landscaping. Ask for a schedule by phase or elevation rather than a single end date, and for the names of the people who will run the job.

The contract itself should reference the engineer's drawings, specifications and addenda by date, carry the unit prices from the bid form, and describe how changes, retainage, payment applications and warranties are handled. Most engineers and association attorneys have a contract form they prefer. Our part is to sign the documents the board's professionals put in front of us, not to substitute our own terms for them. Nothing on this page is legal advice, and the association's attorney should review the contract before anyone signs it.

During the work

Phasing the work so residents stay home

Most restoration on occupied buildings is phased so residents can stay. Work moves by elevation, stack or garage bay. Balconies close only while they are under repair, and residents get written notice before their unit is affected, with dates for railing removal, noisy work and the days they need to clear the balcony. Overhead protection goes up at entrances, parking is rearranged in stages, and pool or amenity closures are scheduled for the time of year the board prefers wherever the work allows.

Communication carries as much weight as the concrete. We agree a notice routine with the manager at the start: what residents hear, how far ahead, through which channel, and who answers their questions. The board receives regular progress reports with photographs, quantities against the estimate and the phases coming up next. When something unexpected turns up under a tile floor or inside a slab, the board hears about it from us and from the engineer together, along with the options and their effect on the schedule.

Paying for it

Reserves, special assessments and the reserve study

Florida Statute 718.112(2)(g) requires a residential condominium association to complete a structural integrity reserve study at least every 10 years for each building of three or more habitable stories. The study covers the roof, the structure, fireproofing and fire protection systems, plumbing, electrical systems, waterproofing and exterior painting, and windows and exterior doors, among other items. It must be performed or verified by a licensed engineer or architect or by a credentialed reserve specialist, and its findings drive the reserve amounts in the budget.

Condo boards fund restoration from reserves, special assessments, a loan or line of credit, or a combination. The statute allows associations to borrow to fund work required by a milestone inspection or a reserve study. Those decisions belong to the board, its manager, its accountant and its attorney. What we can provide is a schedule of values and a phasing plan early, so the board knows when each part of the contract is likely to be billed and can time assessments or loan draws to match.

Checklist

Questions a board should ask every contractor

  1. 01Did you price the engineer's bid form exactly as issued?
  2. 02Which items did you clarify or exclude, and why?
  3. 03Can we verify your license and insurance certificates?
  4. 04Who will be the superintendent on our building?
  5. 05How will you phase the work by elevation or stack?
  6. 06How will residents be told before work reaches them?
  7. 07How do you track quantities against the estimate?
  8. 08Who pulls the permit and schedules inspections?

Summary

Key takeaways for condo boards

  • 01

    Condo boards get the fairest comparison when every contractor bids the same engineer's drawings, specifications and bid form.

  • 02

    Compare unit prices, clarifications, exclusions and schedules on each proposal, not only the total.

  • 03

    Florida Statute 718.3026 requires condominium associations to obtain competitive bids for larger contracts and does not require accepting the lowest bid.

  • 04

    Phasing by elevation or stack, with written notice, lets most residents stay home during restoration.

  • 05

    Funding decisions belong to the board and its professionals, informed by the structural integrity reserve study.

Questions

Questions condo boards ask us.

Can our board hire a contractor without an engineer?

For structural repairs we recommend against it. Without the engineer's drawings and specifications, each contractor proposes its own scope, and the board has no independent professional to compare bids, check quantities or inspect the steel before it is covered. Small, well-defined maintenance items are different, and a manager can often obtain proposals for those directly.

How many contractors should we invite to bid?

Enough for a real comparison without burying the engineer in paperwork. Many condo boards invite a short list of contractors with similar work on occupied buildings, then interview the strongest. Florida Statute 718.3026 requires competitive bids for larger condominium contracts, and the association's attorney and manager confirm how that applies to your project.

Why do restoration bids include unit prices?

Nobody knows the exact amount of deteriorated concrete until the surface is opened. The engineer estimates quantities for each repair type, contractors price each one as a unit, and the contract pays for the quantities actually measured and verified. Unit prices let the board compare bidders fairly and see how the final contract figure will move if repairs grow or shrink.

Will residents have to move out during restoration?

In most projects, no. Work is phased by elevation, stack or area, and a balcony closes only while it is under repair. Some repairs reached from inside a unit, such as a slab edge behind a sliding door, need short access windows scheduled with the resident in advance. The engineer, manager and contractor agree the phasing before work starts.

What does the engineer do once construction starts?

The engineer reviews submittals, answers questions from the field, inspects repair locations before they are closed, verifies quantities for payment applications and decides on any change to the design. The contractor performs the work and manages crews, schedule, safety and records. Keeping those roles separate gives condo boards an independent check on the work they are paying for.

Do you help boards explain the project to owners?

Yes, within our role. We can attend an owners' meeting with the engineer to explain how the work will be phased, what residents will see and hear, and how notices will reach them. Questions about the findings belong with the engineer, and questions about funding belong with the board and its professionals. Our part is the construction plan and the schedule.

Does an HOA follow the same rules as a condominium?

Not always. Florida Statute 553.899 applies to condominium and cooperative buildings of three or more habitable stories, and the structural integrity reserve study in 718.112 applies to residential condominium associations. Homeowners' associations operate under a different chapter and their own governing documents. The association's attorney confirms which obligations apply, and the engineer-led bidding process works the same way either way.

Standards and references

Repair methods and materials on every project follow the engineer's specification, the manufacturer's requirements and the building code in force. This page is general information, not engineering advice.

Request an estimate

Let's look at your project.

Send us the engineer's report, a few photos or a short description. We will schedule a site visit and follow up with a written scope.

  • 45 years in the business
  • Broward and Palm Beach counties
  • Reply within one business day

Prefer to talk?(561) 678-4182

Optional. For a large bid package, paste a download link in the message instead. Images or PDF, up to 50 MB.

We reply within one business day. Your details are only used to respond to this request.

Call Request an estimate