(561) 678-4182 Request an estimate

Broward County, Florida

Concrete Restoration in Coconut Creek

Unified GCS repairs catwalks, stairs, facades, pool decks and parking structures in Coconut Creek, where condominium buildings from the 1970s and 1980s need structural attention.

In short

Who handles concrete repair in Coconut Creek?

Unified GCS carries out concrete restoration in Coconut Creek as the contractor, following inspection reports and repair details prepared by licensed engineers or architects. Projects typically cover condominium catwalks, balconies and stairs, corroded reinforcing steel, railings, stucco and painting, pool decks and parking structures. Permits come from the City of Coconut Creek Building Division, and the building official sets inspection deadlines.

Coconut Creek

Unified GCS performs concrete restoration in Coconut Creek for condominium associations, homeowner associations and commercial owners. Coconut Creek is a planned city in northern Broward County, incorporated in 1967, and it lies inland, west of Pompano Beach and Deerfield Beach. No building in Coconut Creek faces the ocean. The city does contain a large number of condominium buildings that are now forty or fifty years old, and their concrete has aged in the way exposed concrete does in a wet subtropical climate.

Coconut Creek is also a city in two parts. The southern end was built first and holds the older condominium communities. The northern end, from the Winston Park area up to the Hillsboro Boulevard corridor, was developed later and is mainly single-family. Unified GCS has 45 years in the business, and the sections below describe how that experience applies to the building types found in each part of Coconut Creek.

Written and reviewed by the Unified GCS project team, 45 years in concrete restoration and construction. Last reviewed October 2026.

Concrete Restoration in Coconut Creek by Unified GCS

Summary

Coconut Creek at a glance

  • 01

    Coconut Creek was incorporated in 1967 and is an inland city in northern Broward County with no oceanfront buildings.

  • 02

    Southern Coconut Creek holds the oldest condominium communities in the city, built largely in the 1970s and 1980s.

  • 03

    Three- and four-story catwalk buildings are the most common subject of structural concrete repair in Coconut Creek.

  • 04

    The Broward County Building Safety Inspection Program applies in Coconut Creek at 25 years of building age and every 10 years after.

  • 05

    Permits for concrete repair in Coconut Creek are issued by the City of Coconut Creek Building Division.

The buildings

Coconut Creek south to north: condominium communities, a new downtown and business parks

Southern Coconut Creek contains the largest share of multi-story concrete in the city. The Township and nearby neighborhoods date from the 1970s and 1980s, and a large 55-plus condominium community in the south-central part of the city consists of many three- and four-story buildings served by catwalks, stair towers and elevators. Coconut Creek Parkway runs through this older section, and the Broward College North Campus stands in the same southern part of the city with classroom buildings and parking.

Central Coconut Creek is where the city has directed its newer commercial development. The Promenade at Coconut Creek, an open-air shopping center on Lyons Road, opened in 2008. The MainStreet project area lies between Lyons Road and State Road 7 and between Wiles Road and Sample Road, on former farmland now being built out with housing and retail. A tribal casino nearby is served by a multi-level precast parking structure, one of the largest garages in this part of the county.

Northern Coconut Creek includes Winston Park, which dates to 1989, and other lake communities of single-family homes and townhouses, with clubhouses, pools and walking paths maintained by associations. Business and commerce parks along Lyons Road near the Sawgrass Expressway add office, flex and light industrial buildings on slab-on-grade floors. State Road 7 runs along the western side of Coconut Creek and carries older commercial strips as well as newer retail.

What fails and why

How Coconut Creek buildings deteriorate

Catwalk buildings in the older condominium communities of Coconut Creek deteriorate in a consistent sequence. Rain sits on the walkway because the slab was built flat or has deflected. Water enters at the railing posts, at shrinkage cracks and at the joint with the unit wall. The reinforcing steel near the slab edge begins to rust, and the expanding rust cracks the concrete, stains the underside and eventually loosens pieces of the edge. Stair landings and the top of exposed columns follow the same course.

Stucco and paint failures accompany the structural damage in Coconut Creek. Hairline cracks at floor lines and around windows admit water behind the coating, the stucco delaminates, and the wall stays damp. Flat roofs and their parapets add leaks from above. Around the buildings, pool decks crack and settle and sidewalks lift at tree roots. Precast and cast-in-place parking structures in Coconut Creek are vulnerable at joints and connections, where sealant ages and water reaches embedded steel.

Services

Concrete Restoration in Coconut Creek: the work we carry out

Balconies & Railings

Catwalks and stair towers on three- and four-story condominium buildings are the core of structural repair in Coconut Creek. Unified GCS shores the walkway, removes cracked and delaminated concrete, repairs the steel, rebuilds the slab edge with positive drainage, waterproofs the deck and installs new railings. Each Coconut Creek building is divided into sections so that residents keep a protected route to their doors throughout the work.

Milestone & Recertification

After a milestone or Building Safety Inspection, a Coconut Creek association receives a report that lists deficiencies by building and location. Unified GCS carries out the structural items on that list under permit from the Coconut Creek Building Division, keeps a record of quantities and locations as concrete is opened, and coordinates each inspection with the engineer so the completed repair can be documented.

Parking Garages & Plaza Decks

Parking structures in Coconut Creek serve entertainment, retail, education and newer mixed-use properties. Unified GCS repairs deck slabs, precast connections, beams, columns and stairs, replaces joint sealant and expansion joints, and applies traffic coatings that keep water out of the structure. A Coconut Creek garage is repaired in phases agreed with the owner, with signage and barricades directing drivers around each closed area.

Stucco & Painting

Exterior walls on Coconut Creek condominium buildings need the stucco made sound before any coating goes on. Unified GCS sounds the facade, cuts out hollow areas, repairs cracks and bands at floor lines, replaces sealant at windows and doors, and applies an elastomeric or high-build coating. Coordinating this with catwalk repairs lets a Coconut Creek association finish a building completely before the crew moves on.

Commercial Pools & Decks

Clubhouse and community pools in Coconut Creek, from the 55-plus communities to the lake neighborhoods in the north, wear at the finish, the tile line and the deck. Unified GCS resurfaces pool shells, replaces coping and tile, reseals expansion joints and repairs or rebuilds decks that have cracked or settled. Drainage around a Coconut Creek pool deck is corrected so that water no longer stands against the coping.

Commercial Roofing

Coconut Creek's large 55-plus condominium community in the south-central part of the city is made up of many three- and four-story buildings, which turns reroofing into a phased, building-by-building program under one specification. Office, flex and light industrial buildings in the commerce parks along Lyons Road carry broad low-slope roofs. Unified GCS installs HVHZ-approved systems on both and repairs roof deck concrete before the membrane goes down.

See every service we provide in Broward County, or the full list of our services.

Inspections and permits

Inspection and permit requirements for Coconut Creek buildings

Coconut Creek is subject to the Broward County Building Safety Inspection Program, as every city in the county is. Board of Rules and Appeals Policy 05-05 requires a structural and electrical safety inspection by a licensed engineer or architect when a building reaches 25 years of age, repeated every 10 years, and it is enforced locally by the building official of Coconut Creek. The exemptions include one- to four-family dwellings of three or fewer habitable stories, fee simple townhouses, government and school buildings, and minor structures under 3,500 square feet.

Many condominium buildings in Coconut Creek have three or more habitable stories, which brings them under Florida Statute 553.899 for milestone inspections and Statute 718.112(2)(g) for structural integrity reserve studies at least every 10 years. A milestone inspection begins with a visual phase one, and a phase two follows only if substantial structural deterioration is found. Repairs are permitted through the City of Coconut Creek Building Division. Notice dates and submittal steps should be confirmed directly with that office.

Where in Coconut Creek

Neighborhoods and corridors we work in

  • The Township
  • Winston Park
  • Banyan Trails
  • MainStreet project area
  • Coconut Creek Parkway
  • Lyons Road corridor
  • Sample Road corridor
  • Wiles Road corridor
  • Hillsboro Boulevard corridor
  • State Road 7 corridor

How a project runs

How a project runs, from first visit to closed permit.

  1. 01

    Walk the property

    We start on site with your manager, board or engineer and look at the conditions first-hand.

  2. 02

    Define the scope

    You get a written scope tied to the engineer's report or our findings, with the phasing spelled out.

  3. 03

    Plan access and safety

    Swing stages, shoring, barricades, parking and resident notices are set before the first cut.

  4. 04

    Do the work

    Our crews carry out the repairs in sequence, with inspections at the points the engineer requires.

  5. 05

    Close it out

    Final inspections, permit closure and a record of what was done, for the association's files.

Questions

What owners and boards in Coconut Creek ask

What causes catwalk damage on Coconut Creek condominium buildings?

Water and time. Catwalks in Coconut Creek were often built with little slope, so rain collects and enters at cracks and railing posts. As the concrete ages it loses its ability to protect the reinforcing steel, the steel rusts and swells, and the slab edge cracks and spalls. Salt air is not a factor this far inland.

Who should a Coconut Creek association call first, an engineer or a contractor?

For structural concerns, an engineer. A licensed engineer or architect inspects the building and specifies the repair. Unified GCS then performs concrete restoration in Coconut Creek to that specification under a city permit. For non-structural items such as pool resurfacing, sidewalk replacement or repainting, an association can contact the contractor directly to arrange a site visit.

Do three-story condominium buildings in Coconut Creek need a milestone inspection?

Florida Statute 553.899 applies to condominium and cooperative buildings of three or more habitable stories, so a three-story Coconut Creek condominium building is within the statute. In Broward County the Building Safety Inspection Program sets the first inspection at 25 years of age. The Coconut Creek building official confirms the applicable date and requirements for each building.

Can catwalk repairs in Coconut Creek be completed with residents in place?

Yes. Catwalk and stair repairs on Coconut Creek buildings are planned so that units remain occupied. Sections of walkway are closed in turn, with shoring below and protected passage maintained to a stair or elevator. Residents receive a schedule for their section, and work that blocks a doorway is arranged with the affected unit in advance.

Does Unified GCS handle painting as well as concrete repair in Coconut Creek?

Yes. Unified GCS repairs stucco and applies exterior coatings on Coconut Creek buildings, usually as the final stage of a restoration project. Structural repairs are completed and inspected, stucco is patched, joints are sealed and the building is then coated. Doing the work in that order prevents new paint from being damaged by later concrete repairs.

Regulations referenced

This page is general information, not legal or engineering advice. Inspections are performed by licensed engineers and architects, and your building official sets the dates that apply to your property. Unified GCS is the contractor that carries out the repairs.

Referred by an engineer?

Have drawings, specifications or a full set of bid documents?

Most of our restoration, pool and roofing work comes to us through structural engineers, property engineers and board members. When the scope is already drawn and specified, we price exactly what is on the documents, flag anything that needs a question, and show every line so the board can compare bids fairly.

Request an estimate

Let's look at your building.

Send us the engineer's report, a few photos or a short description. We will schedule a site visit and follow up with a written scope.

  • 45 years in the business
  • Broward and Palm Beach counties
  • Reply within one business day

Prefer to talk?(561) 678-4182

Optional. For a large bid package, paste a download link in the message instead. Images or PDF, up to 50 MB.

We reply within one business day. Your details are only used to respond to this request.

Call Request an estimate