Milestone Inspection Repairs in Broward County

From the engineer's report to a closed permit, on a schedule your board can plan around.

In short

Who handles milestone inspection repairs in Broward?

Unified GCS performs milestone inspection repairs in Broward County for condominium, cooperative and commercial owners after a licensed engineer or architect has issued the inspection report. The work involves turning that report into a permitted scope, then completing the concrete, balcony, railing, waterproofing and related repairs so the engineer can confirm the building for continued use.

Milestone & Recertification · Broward

Milestone inspection repairs in Broward County are the structural, waterproofing and envelope repairs that a licensed engineer or architect calls for after inspecting a building under the county's Building Safety Inspection Program. Unified GCS is the contractor that performs those repairs. We do not perform the inspection. We take the report, build a scope, phasing plan and schedule the board can approve, pull the permit and carry the work through to the engineer's final sign-off.

Under Florida Statute 553.899, condominium and cooperative buildings of three or more habitable stories must have a milestone inspection, and Broward's program is how that requirement is met locally. The Board of Rules and Appeals policy states that a Building Safety Inspection serves as compliance with both phase one and phase two of the state milestone inspection. For a board, the practical result is one report and one list of required repairs.

Written and reviewed by the Unified GCS project team, 45 years in concrete restoration and construction. Last reviewed October 2026.

Milestone inspection repairs in Broward County by Unified GCS
Broward County coastal condominium buildings

Local conditions

How the Building Safety Inspection Program works in Broward County

Board of Rules and Appeals Policy 05-05 requires a structural and electrical inspection when a building reaches 25 years of age, based on its certificate of occupancy, and every 10 years after that. Each summer the building official in your city sends a Notice of Required Inspection to buildings that are due. The owner or association then has 180 days to have the inspection completed and the report submitted. The policy allows the building official to grant an extension of up to 60 days.

If the report requires repairs, the policy gives the owner 180 days from the date of the report to complete them unless the building official specifies otherwise. Where repairs cannot be finished in that time, the period may be extended on a schedule set by the engineer and approved by the building official, provided the permit stays active. When work is done, the engineer re-inspects and issues an amended report confirming the building is acceptable for continued use.

Where this work is needed

Which Broward buildings are receiving inspection reports

Oceanfront condominium towers in Fort Lauderdale, Pompano Beach, Hollywood and Hallandale Beach were the first large group in Broward to work through inspection reports, and many are now in a later 10-year cycle. Reports on these buildings typically list balcony slab edges and railings, columns and beams in open parking levels, stair towers, roof slabs, and the pool deck over the garage. Electrical findings, such as corroded panels, meter rooms and emergency lighting, appear in the same report and need a licensed electrical contractor.

Inland Broward buildings are reaching their inspection dates in large numbers. The three- and four-story condominium communities of Tamarac, Lauderhill, Lauderdale Lakes, Sunrise, Margate and Pembroke Pines have many separate buildings, and each one is inspected. Reports there usually list catwalk and stair repairs, railing corrections, cracked stucco hiding spalled concrete and roof-level items. Commercial owners are included as well: office buildings, shopping centers, hotels and warehouses above the size exemption fall under the same county inspection program as condominiums.

What is included

Milestone inspection repairs in Broward County: scope of work

  1. 01Review of the engineer's Phase 1 and Phase 2 findings
  2. 02Repair scope, phasing and schedule for board approval
  3. 03Structural concrete, waterproofing and envelope repairs
  4. 04Permitting and building department inspections
  5. 05Coordination with the engineer of record throughout
  6. 06Documentation for the association's records
Milestone & Recertification work in progress in Broward County

Our approach

From the engineer's report to a closed permit

We read the report with the engineer and walk the building to confirm locations and access. The board receives a written scope with phasing by elevation or area, the access method for each phase and a schedule. Because the repair window is short, we start the permit application and material and railing lead times as soon as the scope is approved.

During the work, the engineer inspects exposed steel and each repair stage. If the engineer has issued a letter stating the building may remain occupied during repairs, we plan the work to keep it that way: protected entrances, phased balcony closures and maintained egress. At completion we assemble the repair records the engineer needs for the amended report and close the permit with the city.

Unified GCS has 45 years in the business. See the full milestone & recertification service or everything we do in Broward County.

Planning the project

How a Broward board prepares before and after the report

A Broward board gains the most time by acting before the notice arrives. The building official confirms the year a building is due, so an association can engage its engineer a year or more ahead, have the building surveyed, and learn the likely scope while there is still time to plan funding. Florida law also requires a structural integrity reserve study at least every 10 years for condominium buildings of three or more habitable stories, and the two documents should be read together.

After the report is issued in Broward, three tracks run at once. The engineer prepares signed and sealed repair documents and bid quantities. The board arranges funding, which under most condominium documents involves notices, meetings and votes that take weeks. The contractor prepares the permit application for the city building department and orders long-lead items such as railings. If the work will run past the repair period, the engineer submits a schedule to the building official, and the permit is kept active until the amended report is filed.

How a project runs

From the first site walk to the closed permit.

  1. 01

    Walk the property

    We start on site with your manager, board or engineer and look at the conditions first-hand.

  2. 02

    Define the scope

    You get a written scope tied to the engineer's report or our findings, with the phasing spelled out.

  3. 03

    Plan access and safety

    Swing stages, shoring, barricades, parking and resident notices are set before the first cut.

  4. 04

    Do the work

    Our crews carry out the repairs in sequence, with inspections at the points the engineer requires.

  5. 05

    Close it out

    Final inspections, permit closure and a record of what was done, for the association's files.

Summary

Key takeaways for Broward owners and boards

  • 01

    A Broward association can engage its engineer a year or more before the inspection is due to learn the likely repair scope early.

  • 02

    Inspection reports in Broward include electrical findings, so a licensed electrical contractor is part of most repair projects.

  • 03

    Inland Broward communities with many buildings have each building inspected, which makes phasing across the property a central decision.

  • 04

    Commercial buildings in Broward above the size exemption fall under the same Building Safety Inspection Program as condominiums.

Questions

Milestone & Recertification in Broward: common questions

How long do we have to complete repairs after a Building Safety Inspection in Broward County?

Board of Rules and Appeals Policy 05-05 gives 180 days from the date of the report unless the building official specifies otherwise. For work that cannot be completed in that time, the engineer can propose a longer schedule for the building official's approval, with an active permit maintained. Confirm the deadline for your property with your city's building department.

Is a 40-year recertification still required in Fort Lauderdale or Hollywood?

The former 40-year program has been replaced. Broward's current policy sets the first inspection at 25 years and repeats it every 10 years. Buildings that completed an inspection under the earlier 40-year program are treated as compliant, with later inspections due every 10 years from the year that first inspection was required.

Does Unified GCS perform the Building Safety Inspection for Broward County buildings?

No. The inspection must be performed by a Florida licensed engineer or architect, and for larger buildings the structural portion requires additional qualifications. We are the contractor that carries out the repairs. If your association has not engaged an engineer yet, we can point you in the right direction and coordinate with them.

Should a Pompano Beach association hire the contractor before or after the engineer's report?

After the report, but early. The engineer's repair documents define the scope every contractor bids on, so bids taken before they exist cannot be compared. A contractor can still walk the building with the board and engineer beforehand to advise on access, phasing and lead times, which shortens the period between the report and the permit.

What repairs do Broward County inspection reports most often require?

Reports commonly list spalled concrete on balconies, catwalks, columns and beams, loose or non-compliant railings, failed waterproofing on decks, cracked stucco and electrical corrections. Milestone inspection repairs in Broward County are defined building by building, and only the engineer's report states what is required at your property and in what order of urgency.

How does a multi-building community in Tamarac or Lauderhill phase its required repairs?

The engineer ranks findings by urgency across all buildings. Items that affect safety, such as unsound walkways, stairs and railings, are repaired first wherever they occur. The remaining work is then grouped building by building so crews, access equipment and resident disruption move through the property in an orderly sequence under the approved schedule.

Regulations referenced

This page is general information, not legal or engineering advice. Inspections are performed by licensed engineers and architects, and your building official sets the dates that apply to your property. Unified GCS is the contractor that carries out the repairs.

Referred by an engineer?

Have drawings, specifications or a full set of bid documents?

Most of our restoration, pool and roofing work comes to us through structural engineers, property engineers and board members. When the scope is already drawn and specified, we price exactly what is on the documents, flag anything that needs a question, and show every line so the board can compare bids fairly.

Request an estimate

Let's look at your building.

Send us the engineer's report, a few photos or a short description. We will schedule a site visit and follow up with a written scope.

  • 45 years in the business
  • Broward and Palm Beach counties
  • Reply within one business day

Prefer to talk?(561) 678-4182

Optional. For a large bid package, paste a download link in the message instead. Images or PDF, up to 50 MB.

We reply within one business day. Your details are only used to respond to this request.

Call Request an estimate