Palm Beach County, Florida
Milestone Inspection Repairs in Palm Beach County
From the engineer's report to a closed permit, on a schedule your board can plan around.
In short
Who handles milestone inspection repairs in Palm Beach?
Milestone inspection repairs in Palm Beach County are carried out by restoration contractors such as Unified GCS after a licensed engineer or architect completes the inspection. The work involves repairing the structural deterioration the report identifies, under a building permit and with the engineer inspecting the repairs and documenting their completion for the building official.
Milestone & Recertification · Palm Beach
Milestone inspection repairs in Palm Beach County are the repairs a condominium or cooperative association carries out after a licensed engineer or architect inspects the building under Florida Statute 553.899. Unified GCS is the contractor for that work. We do not perform the inspection. We take the phase one or phase two report, prepare a scope and schedule, obtain the permit and complete the structural, waterproofing and envelope repairs under the engineer's direction.
The statute applies to buildings of three or more habitable stories. Phase one is a visual examination by the engineer or architect. If it finds signs of substantial structural deterioration, phase two follows and may include destructive or nondestructive testing to define the extent of the damage and the repairs. That phase two report, or the repair recommendations in a phase one report, is the document we build the project from.
Written and reviewed by the Unified GCS project team, 45 years in concrete restoration and construction. Last reviewed October 2026.


Local conditions
How milestone inspections are administered in Palm Beach County
State law sets the first inspection by December 31 of the year a building reaches 30 years of age, based on its certificate of occupancy, and every 10 years after. It also lets the local enforcement agency require the first inspection at 25 years where conditions such as proximity to salt water justify it. In unincorporated Palm Beach County, the Building Division applies 25 years to buildings within three miles of the coastline and 30 years to buildings farther inland.
Most coastal condominiums, however, are inside a city or town, and each municipal building department administers the requirement for its own buildings. Boca Raton has its own Building Recertification Inspection Program, adopted in 2021, which requires structural and electrical reports. Other municipalities follow the state statute or their own ordinance. Because the rules are not identical, the notice from your building official is what establishes your deadline.
Where this work is needed
Buildings reaching their milestone dates and what the reports list
The buildings now receiving notices fall into recognizable groups. Oceanfront towers on A1A in Boca Raton, Highland Beach and on Singer Island have usually been through earlier restoration, and their reports tend to list recurring damage at balcony edges, deterioration at the garage level and roof and parapet conditions. Mid-rise buildings in Delray Beach, South Palm Beach, Juno Beach and Jupiter commonly show findings at open stair towers, walkway slabs, railing attachments and the columns of ground-level parking. Cooperative buildings are covered by the same statute as condominiums.
Inland, the three- and four-story buildings of the large communities in West Palm Beach, Greenacres, Boynton Beach and west of Delray Beach form another large group. Many have never had a structural report before, and each building in a multi-building community is evaluated. Typical findings are cracked walkway and stair concrete, corroded railing posts, damaged slab edges at screened porches and spalled columns at breezeways. Because several buildings share one association and one budget, these projects are usually organized as a program, with the most urgent findings first.
What is included
Milestone inspection repairs in Palm Beach County: scope of work
- 01Review of the engineer's Phase 1 and Phase 2 findings
- 02Repair scope, phasing and schedule for board approval
- 03Structural concrete, waterproofing and envelope repairs
- 04Permitting and building department inspections
- 05Coordination with the engineer of record throughout
- 06Documentation for the association's records

Our approach
Turning the engineer's report into a finished project
We review the report with the engineer, walk the building and confirm how each repair area will be reached. The board receives a scope tied to the report, a phasing plan and a schedule that accounts for the season and any local limits on construction hours. Under the statute, repairs for substantial structural deterioration must begin within 365 days of the phase two report, and a local ordinance may set an earlier date.
The engineer inspects the work as it proceeds and, when repairs are complete, prepares the follow-up documentation the building department requires. We supply the repair logs, photos and quantities that support it. Associations also use this record when updating their structural integrity reserve study, since it shows which components were restored and when.
Unified GCS has 45 years in the business. See the full milestone & recertification service or everything we do in Palm Beach County.
Planning the project
From the notice to a funded, permitted repair project
The statute gives the process fixed steps. Phase one must be completed within 180 days after the owners receive written notice. The engineer or architect submits a sealed report to the association and to the building official with jurisdiction, and the association must distribute the inspector-prepared summary to unit owners within 45 days of receiving the report. Boards can use that period to engage the engineer for repair documents, since a contractor needs quantities and details, not only findings, to prepare a scope.
Funding and timing are decided together. The board works with its manager, attorney and reserve study provider on how the repairs will be funded, and the governing documents and the Condominium Act determine what approvals are needed. Engineers and contractors are busiest ahead of common deadlines, so an early start gives a board more choice over when work happens. Hurricane season, the rainy months and winter occupancy all shape the phasing. Associations and some towns restrict noisy work in season, and current rules are confirmed before the schedule is fixed.
How a project runs
From the first site walk to the closed permit.
- 01
Walk the property
We start on site with your manager, board or engineer and look at the conditions first-hand.
- 02
Define the scope
You get a written scope tied to the engineer's report or our findings, with the phasing spelled out.
- 03
Plan access and safety
Swing stages, shoring, barricades, parking and resident notices are set before the first cut.
- 04
Do the work
Our crews carry out the repairs in sequence, with inspections at the points the engineer requires.
- 05
Close it out
Final inspections, permit closure and a record of what was done, for the association's files.
Cities served
Milestone & Recertification across Palm Beach County
Summary
Key takeaways for Palm Beach owners and boards
- 01
Phase one of a milestone inspection in Palm Beach County must be completed within 180 days after the owners receive written notice, under Florida Statute 553.899.
- 02
Palm Beach County associations must distribute the inspector-prepared summary of a milestone report to unit owners within 45 days of receiving it.
- 03
Multi-building inland communities in West Palm Beach, Greenacres and Boynton Beach usually organize milestone repairs as a building-by-building program.
- 04
A milestone report for a Palm Beach County building lists findings, and separate repair documents with quantities and details are needed for a permit.
Questions
Milestone & Recertification in Palm Beach: common questions
Is the milestone inspection due at 25 or 30 years in Palm Beach County?
In unincorporated Palm Beach County, the Building Division uses 25 years for condominium and cooperative buildings within three miles of the coastline and 30 years for those farther inland, then every 10 years. Buildings inside a municipality follow that city or town's administration of the law. Your building official sets the date that applies.
How does Boca Raton's recertification program relate to the state milestone inspection?
Boca Raton adopted its own Building Recertification Inspection Program in 2021, covering buildings over three stories or 50 feet among others and requiring structural and electrical reports. The state milestone law applies statewide to condominium and cooperative buildings of three or more habitable stories. The city building division tells each owner what must be submitted and when.
What is a structural integrity reserve study, and how does it connect to repairs in Palm Beach County?
Under Florida Statute 718.112, condominium associations with buildings of three or more habitable stories must complete a structural integrity reserve study at least every 10 years. It covers items such as the roof, structure, waterproofing and exterior painting, and windows and exterior doors. Completed repairs change the remaining life the study assigns to those components.
What happens after a phase one report finds no substantial structural deterioration at a Jupiter or Boynton Beach condominium?
If phase one finds no signs of substantial structural deterioration, phase two is not required, and the engineer or architect submits the sealed report to the association and the building official. The report may still recommend maintenance or repairs. Many boards schedule that work anyway.
Can a Boca Raton or Delray Beach association start repairs before phase two is finished?
Often, yes, with the engineer's agreement. Urgent conditions can be shored or repaired under a permit while testing continues elsewhere in the building. For most milestone inspection repairs in Palm Beach County, though, the full scope is defined by the phase two report and the repair documents.
Who submits the proof that milestone repairs are complete to the building official in Highland Beach or West Palm Beach?
The engineer or architect prepares the documentation, and the building department closes the permit after its own final inspection. As the contractor, Unified GCS supplies what supports that: repair logs by location, photographs of exposed and repaired steel, material records and measured quantities. The building official confirms what has to be filed and by when.
Regulations referenced
- Palm Beach County Building Division: mandatory milestone inspections
- City of Boca Raton: Building Recertification Inspection Program
- Florida Statute 553.899: mandatory structural inspections for condominium and cooperative buildings
- Florida Statute 718.112: structural integrity reserve studies
This page is general information, not legal or engineering advice. Inspections are performed by licensed engineers and architects, and your building official sets the dates that apply to your property. Unified GCS is the contractor that carries out the repairs.
Referred by an engineer?
Have drawings, specifications or a full set of bid documents?
Most of our restoration, pool and roofing work comes to us through structural engineers, property engineers and board members. When the scope is already drawn and specified, we price exactly what is on the documents, flag anything that needs a question, and show every line so the board can compare bids fairly.
Request an estimate
Let's look at your building.
Send us the engineer's report, a few photos or a short description. We will schedule a site visit and follow up with a written scope.
- 45 years in the business
- Broward and Palm Beach counties
- Reply within one business day
Prefer to talk?(561) 678-4182
We reply within one business day. Your details are only used to respond to this request.