In short

What is structural concrete?

Structural concrete is the reinforced concrete that carries a building's loads: footings, grade beams, foundations, slabs, columns, beams and shear walls. A project needs this work for new construction, additions and equipment foundations, and an existing building needs it when an engineer identifies foundation settlement, cracking or a member that must be strengthened or replaced.

Structural Concrete

From a single equipment foundation to a full building slab, we form, reinforce, place and finish structural concrete. On existing buildings we repair foundations and address settlement and cracking at the source.

Unified GCS has spent 45 years in this business. We carry out structural concrete projects across Broward and Palm Beach counties for condominium associations, property managers, commercial owners and industrial operators.

Written and reviewed by the Unified GCS project team, 45 years in concrete restoration and construction. Last reviewed October 2026.

Structural Concrete in South Florida by Unified GCS

Why it happens

Why foundations and load-bearing pours have to be right the first time

A foundation transfers the weight of a building into the ground, and the ground in South Florida varies over short distances: sand, pockets of organic muck, fill of unknown quality and limestone at changing depth. The water table is often only a few feet down. A footing placed on soft or uneven material settles unevenly, and differential settlement shows up as stair-step cracks in block walls, sloping floors and doors that bind. The geotechnical report sets the bearing conditions the design depends on.

The concrete itself has to last in a humid, salt-laden climate. Durability comes from a dense mix with a low water-to-cement ratio, enough cover over the steel and proper curing. Water added at the site to make placement easier weakens the mix and makes it more permeable. Poor consolidation leaves honeycombing, and an unplanned stop in placement leaves a cold joint. Unlike a finish, these defects are locked into the structure and are difficult to correct afterward.

What is included

Structural Concrete: scope of work

  1. 01Footings, foundations and grade beams
  2. 02Slab-on-grade and elevated slabs
  3. 03Columns, beams, shear walls and tilt-up panels
  4. 04Foundation settlement and crack repair
  5. 05Formwork, reinforcing steel and pump placement
  6. 06Structural additions and modifications

How we do it

How a load-bearing pour is built

Layout and excavation come first, and the bearing surface is compacted and verified as the geotechnical engineer requires. Forms are built to line and grade and braced to resist the pressure of wet concrete. Reinforcing steel is placed to the drawings, with the bar sizes, spacing and lap lengths shown, tied securely and held on chairs or spacers so the specified cover is maintained. Embedded items, sleeves and anchor bolts are set and checked before anything is covered.

Reinforcement and formwork are inspected before the pour, by the building department and by the engineer or special inspector where the project requires. Concrete is ordered to the specified mix design and delivery tickets are checked on arrival. Slump is tested and cylinders are cast for strength testing as the specification directs. The concrete is placed by pump or chute in layers and vibrated to consolidate it around the steel, and placement is planned so that joints fall only where the drawings permit.

Finishing follows placement, then curing, which matters most in hot, windy weather when the surface dries quickly. Wet curing or a curing compound keeps moisture in while the concrete gains strength. Forms on walls and columns can come off fairly early, but shoring under elevated slabs and beams stays until test results show the strength the engineer requires, and reshores may remain longer. For settlement repairs on existing foundations, the method is designed by the engineer for that site.

Materials and systems

Mix designs, reinforcing steel and formwork: how each is specified

Every load-bearing pour starts with a mix design, the recipe the engineer approves for a specified compressive strength and exposure. Portland cement is commonly blended with fly ash or slag cement, which lower permeability and slow chloride penetration, and the ratio of water to cementitious material is capped for durability. Water-reducing admixtures keep the mix workable without extra water, retarders extend working time in heat, and corrosion-inhibiting admixtures may be specified near the coast. Aggregate size is matched to bar spacing and the pump line.

Reinforcing steel is typically deformed carbon-steel bar in the grade the drawings call for, with epoxy-coated, galvanized or stainless bar specified where corrosion exposure justifies it. Post-tensioning tendons replace some conventional bar in long-span slabs. Formwork ranges from job-built lumber and plywood to modular steel or aluminum panel systems, chosen for the finish required and the number of reuses. Concrete reaches the forms by chute, pump or crane and bucket. Foundation type, whether spread footings, a mat or deep piles, is determined by the geotechnical and structural engineers.

What makes it last

What separates sound load-bearing concrete from a problem pour

The quality of a foundation or frame is settled before the truck arrives. Bars at the correct spacing and lap, supported so that cover is right on every face, clean forms, tight joints and a verified bearing surface are the things inspectors look for. During placement the controls are simple and strict: no unapproved water added, the time limit from batching respected, proper vibration, and test cylinders taken at the specified frequency. Afterward, curing and keeping shores in place until strength is confirmed protect what was built.

A structural concrete proposal should list what is included in plain terms: excavation, formwork, reinforcing, embedded items, pumping, finishing, curing, testing and who engages the testing laboratory. Ask how pours will be sequenced, where construction joints are planned, and how hot weather and rain are handled. During the work, an owner can ask to see the approved mix design, reinforcing shop drawings, delivery tickets, inspection sign-offs and cylinder break reports. Those records, kept together, are the lasting evidence that the structure was built as designed.

Structural Concrete work in progress

How a project runs

Planned around the people who use the building.

  1. 01

    Walk the property

    We start on site with your manager, board or engineer and look at the conditions first-hand.

  2. 02

    Define the scope

    You get a written scope tied to the engineer's report or our findings, with the phasing spelled out.

  3. 03

    Plan access and safety

    Swing stages, shoring, barricades, parking and resident notices are set before the first cut.

  4. 04

    Do the work

    Our crews carry out the repairs in sequence, with inspections at the points the engineer requires.

  5. 05

    Close it out

    Final inspections, permit closure and a record of what was done, for the association's files.

Summary

Structural Concrete: key takeaways

  • 01

    The engineer approves a concrete mix design for strength and exposure, and water added on site undermines both.

  • 02

    Fly ash and slag cement lower the permeability of concrete, which slows chloride penetration in coastal structures.

  • 03

    Correct bar placement and cover are verified by inspection before a pour, because they cannot be corrected afterward.

  • 04

    Delivery tickets, inspection sign-offs and cylinder break reports form the permanent record that a pour met its design.

Glossary

Terms you will see in the engineer's report

Grade beam
A reinforced concrete beam at or below ground level that spans between footings or piles and carries wall loads to them.
Shear wall
A reinforced concrete or masonry wall designed to resist sideways forces from wind, transferring them down through the building to the foundation.
Slump
A field measurement of how much a cone of fresh concrete settles when the mold is lifted. Slump indicates workability and consistency between loads.
Lap splice
The length over which two reinforcing bars overlap side by side so that force transfers from one bar to the next through the surrounding concrete.
Cold joint
A plane of weakness formed when fresh concrete is placed against concrete that has already begun to set, so the two layers do not blend together.

Questions

Structural Concrete: common questions

What are concrete test cylinders for?

Cylinders are samples cast from the concrete delivered to the site and broken in a laboratory at set ages, commonly 7 and 28 days, to confirm the mix reached its specified compressive strength. The results help the engineer decide when shoring can be removed and provide a permanent record that the material met the design.

Can concrete be poured in the rain?

Light rain on concrete that has already been placed and finished can be managed by covering it. Heavy rain during placement adds water to the surface, weakens the top layer and can wash out the paste. Pours are scheduled around the forecast, and protection is kept on site, because a summer afternoon storm is routine in South Florida.

What does a geotechnical report tell the builder?

A geotechnical report describes the soil and rock beneath a site based on borings and laboratory tests. It gives the depth to ground water, the bearing capacity the structural engineer can design for, and recommendations for foundation type, compaction and fill. The contractor uses it to plan excavation, dewatering and subgrade preparation, and the engineer relies on it for the foundation design.

How long does concrete take to reach full strength?

Concrete gains strength fastest in its first week and continues for months. Design strength is conventionally measured at 28 days, which is why cylinders are tested at that age. Mixes containing fly ash or slag often gain strength more slowly at first and keep gaining longer. The engineer, using test results, decides when forms, shores and loads are permitted.

Can residents stay in the building during restoration?

In most projects, yes. Work is phased by elevation or stack, balconies are closed only while they are under repair, and notices go out before anything affects residents. We agree the sequence and access plan with the board and manager before work starts.

Do you work with our engineer?

Yes. Structural repairs are built to the specification of your engineer of record, and we coordinate inspections with them throughout the job. If you do not have an engineer yet, we can help you get started.

Standards and references

Repair methods and materials on every project follow the engineer's specification, the manufacturer's requirements and the building code in force. This page is general information, not engineering advice.

Referred by an engineer?

Have drawings, specifications or a full set of bid documents?

Most of our restoration, pool and roofing work comes to us through structural engineers, property engineers and board members. When the scope is already drawn and specified, we price exactly what is on the documents, flag anything that needs a question, and show every line so the board can compare bids fairly.

Request an estimate

Let's look at your building.

Send us the engineer's report, a few photos or a short description. We will schedule a site visit and follow up with a written scope.

  • 45 years in the business
  • Broward and Palm Beach counties
  • Reply within one business day

Prefer to talk?(561) 678-4182

Optional. For a large bid package, paste a download link in the message instead. Images or PDF, up to 50 MB.

We reply within one business day. Your details are only used to respond to this request.

Call Request an estimate